Geology Gravimetry Seismics Drilling
Reservoir engineering Rock mechanics Solution mining Project management

 

Gas storage - Subsurface - Reservoir engineering                          

 

 

 

For a fractured reservoir under high pressure first storage volume estimates have to be verified by further investigation of the maximum allowable formation pressure.
This services are directed by Henjes Metall- und Anlagenbau and the systempartner StorConsult

 

Bottom hole and wellhead pressures were measured during single well and interference tests.
The numerical model was calibrated by history matching the calculated to the observed dynamical behavior of the reservoir.